ČKD ENERGY

provider of investment units and related systems. Specializing in power industry and ecology

Thermal power plants 100-500 MW (fuel - coal, natural gas)

  • use of technology of powdered or fluidized bed combustion boilers and water or air cooled condensing turbines
  • complementary delivery of desulphurisation technology for large output units depending on coal quality
  • provision of delivery of technologies with above-critical parameters
  • know how and experience with construction of steam-gas power plants (CCPP - Combined Cycle Power Plant) up to the total power output of 900 MW
  • use of steam-gas power plant technology for so called retrofit (repowering)
  • especially in location where are still used boilers burning diesel fuel, black oil, light  fuel oil and natural gas
  • obsolete boilers can be replaced by combination of gas turbine and waste heat boiler (HRSG - heat recovery steam generator); generated steam drives existing steam turbines
  • generated power output increase by up to 60% in the given location  

Reference projects:

  • Afsin Elbistan Power Plant 4x360 MW, Turkey
  • Balloki Steam-gas Power Plant 225 MW, Pakistan
  • Muridke Steam-gas Power Plant 234 MW, Pakistan
  • Power plant 3S 3 x 133 MW, Turkey