References


COGEN III - boiler house Holy Vrch (city of Ceska Lipa)

Technical parameters: 

  • delivery and installation of 2 pieces of cogeneration units based on MWM gensets
  • 2 pc of TCG2020 V20
  • total electrical output: 4028 kWe
  • total heat capacity: 4276 kWt


Scope of supply:

  • Switchboards
  • Heat exchangers
  • Coolers
  • Silencers
  • Noise cabs
  • Pumps
  • Overhead cranes
  • Piping components
  • Measurement and Control Technology
  • Cabling

 

Completion date: 2010-2011
Commissioning: 4/2011