Power block for biomass combustion, Plzeňská teplárenská
In 2008-10, we have built, as a general contractor, a unique facility for biomass combustion for the company Plzeňská teplárenská, a.s.
All the guaranteed device parameters including contract values of equipment reliability have been fulfilled.
Scope of work:
- Design
- Delivery of equipment
- Assembly
- Commissioning of steam boiler for biomass combustion power of 45 tons per hour.
- Steam turbine with an electrical output of 13.5 MWe
Delivery of related equipment:
- Fuel tank
- Electric filter
- Combustion products duct
- Smoke fan
- Pneumatic transport system of fly ash
- Indoor connecting pipes in the engine room and boiler room
- Boiler feed station including feedwater tank
- Internal and external cooling circuit
- Electrical equipment and control system
- Execution of related demolition and construction works
Completion date: 2008 - 2010
Commissioning: May 2010